L2B Blog: Exploring New Ideas in the Role of the Project Manager

Exploring New Ideas in the Role of the Project Manager

If you are involved in the construction industry you have most likely come into contact with a Project Manager (hereafter referred to as a PM) or heard of one mentioned in the process of developments and particularly larger developments.

Certainly in Leads 2 Business’ Projects Department PM’s are one of the most common professionals we deal with. The reason for this, is their role within construction projects.

So, what does a PM actually do? It would seem rather obvious right, they manage the project? But nothing is ever as simple as it seems. PM’s actually do a whole host of duties.

Some of which include: planning, organising, controlling, communicating, executing, reports, programs, advice, analysis, resource control, health and safety, budgets, administration and handover.

All of these duties are done ensure that the project runs successfully thus lowering the risks while meeting all of the objectives timeously to ensure completion which effects the profitability of the project.

So, when do new ideas come into the picture? What new ideas would PM’s have to explore in todays construction industry?

To be honest, I was at a loss when pondering this question, after all I’m not a PM and it’s not a role one easily assumes to answer. So I emailed a few PM’s to get some feedback on ideas that they might want to put out there… but still no luck, probably snowed under with work given our economic environment. I scoured the Internet and there didn’t seem to be any publications or news out there for new ideas when it comes to PM’s until I happened on some LinkedIn Posts. Phew!

This may not be a new idea but how about technology, either using existing tech and / or molding it to PM’s requirements, partnering with IT and creating PM specific tech or even sharing your tech tricks with other PM’s? For example: Ahmed H. Emam, PMP writes “Detect and Fix Dangling Activities in Time Schedule using Excel Macro.” https://www.linkedin.com/pulse/detect-fix-dangling-activities-time-schedule-using-excel-pmp

Using tech could make PM’s jobs easier but some seem to think that PM’s might be replaced in the future by Tech/Bots. As Oliver Yarbrough, M.S., PMP illustrates in “Can a Robot Do Your Job? Here’s “How Project Managers Can Survive a Takeover.” https://www.linkedin.com/pulse/can-robot-do-your-job-heres-how-project-managers-oliver

There are some things that tech, no matter how advanced it gets, cannot replace. Oliver suggests to focus on the following skills in order to stand out: “Leadership, Diplomacy, Negotiating, Public Speaking, Emotional Intelligence, Communication (verbal and nonverbal)” and instead of fighting tech, work with it to enhance your service delivery.

Another thought also came to mind: what is one of the key aspects that I think of when I think of a PM? It would have to be communication. So, what new idea would make communication more effective? What about a platform where all the schedules, notes, admin, planning and analysis can be seen by all the professionals involved in a specific project? Where each person can make notes or get alerts thus avoiding confusion, emails back and forth, potential loss of material, and saving time, something like Google Sheets for PM’s? Does this already exist? It’s possible… calling all PM’s out there, let us know! Perhaps I need to patent this idea.

After all, we all know that communication is key whether you are a PM or not. Another useful tool to facilitate communication and interaction between professionals and all other contacts which fall within the scope of projects is to use L2B (Leads 2 Business). If you are looking to get involved in the different aspects of construction, information is our business. We encourage communication, new ideas and growth in order to build and establish business.

If any of the above sparks your interest leave a Comment below or or Contact me on SashaA@L2B.co.za

Source:

http://profica.com/Project-Management

https://www.linkedin.com/pulse/detect-fix-dangling-activities-time-schedule-using-excel-pmp?trk=v-feed&lipi=urn%3Ali%3Apage%3Ad_flagship3_search_srp_content%3B6Q7NbKiCNqOpFrfh9U5jyg%3D%3D

https://www.linkedin.com/pulse/can-robot-do-your-job-heres-how-project-managers-oliver?trk=v-feed&lipi=urn%3Ali%3Apage%3Ad_flagship3_search_srp_content%3Brgd4BBE3JHWCHOXLUg24dg%3D%3D

 

 

About Sasha Anderson

Millennial Mom + wife living the hash-tag life. Reach out if you want to talk: L2B, social media, construction, technology, marriage, parenting, popular culture and travel. Remember: If You Fail - Fail Forward

Featured Project : Ballito Junction

Ballito Junction

Ballito Junction

Description : Expansion of the Ballito Junction shopping centre from 9 313m² to 80 000m², and totaling 130 stores. Once completed, it will be known as Ballito Junction, and will function as the dominant super-regional mall in its area. The mall will comprise four split levels of retail and five parking levels. Development rights that exist on the site allow for the centre to be further expanded to 90 000m². The site is located along Leonora Drive in Ballito, KwaZulu-Natal. Approximate GPS Coordinates, as per Google: -29.526867, 31.203649. Total estimated project value: R 1.6 billion.

Status : Underway

Industry: Building

Region : Ballito

Sector : Private

Value : R 100 million+

Timing : Centre is planned to open in March 2017.

Notes: Construction is still on schedule for completion in March 2017.

If you are a valued Projects subscriber, you can find more details click here Ballito Junction – Building – PPA: 14140.

If you are interested in becoming one of our subscribers, please visit our website.
To view notes with screenshots on how to use our website, please visit our Wiki site.
To view more articles, please visit our blog.

About Bianca Warwick

I had the privilege of joining the Leads 2 Business content team in January 2012. I work in the exciting Projects department, following the progress of construction developments in KwaZulu-Natal and the Free State.

Featured Project : Eco Medical Village, Accra, Ghana

Eco Medical Village, Accra, Ghana

Description : Construction of a hospital for a proposed medical village project development is located in Accra, on a 30 acre site acquired adjacent to Ghana Institute of Management and Public Administration in Ghana. The construction of a medical village in Ghana that will consist of: a 380 ward hospital, 120 ward women and children hospital, underground parking space for 1,000 vehicles, 120 ward housing for the elderly, 17 storeys doctors’ offices, a medical shopping mall; all things health; 40 x unit studio apartments for medical trainees; a medical research center in collaboration with world renowned hospitals; a 4 star medical hotel, a 2 star medical hotel, air ambulance and paramedic services and a housing facility for medical staff.

Status : Awarded

Industry: Building

Region : Ghana

Sector : Private

Value : R 100 million+

Timing : 2016 onwards.

Notes: The Developers have completed yet another visit at the Vatican. They are working hard to build the best foundation for Eco Medical Village. Sod-cutting ceremony has not taken place yet.

If you are a valued Projects subscriber, you can find more details click here Eco Medical Village, Accra, Ghana – Hospital- PPA: 17437.

If you are interested in becoming one of our subscribers, please visit our website.
To view notes with screenshots on how to use our website, please visit our Wiki site.
To view more articles, please visit our blog.

About Marlaine Andersen

Leads 2 Business Advertising Co-ordinator and Digital Designer

Featured Project : Discovery Health Head Office

Discovery Health Head Office

 

Description : Construction of the new Discovery Health Head Office, in Sandton, Gauteng. The site will be situated on the corner of Rivonia Road and Sandton Drive. The old Sandton Garden Court Hotel was situated at this site, and has been demolished to make way for the new Discovery hub. The building will consist of two wings with eight floors of offices plus a ground floor and a feature roof level. It will also offer nine basements with over 5,100 parking bays. The property is owned by Growthpoint (55%) and Zenprop (45%). It will be developed in a phased approach, and will incorporate a GBCSA (Green Building Council South Africa) green building accredited rating of at least four stars. It is also set to become a landmark on the Sandton skyline. This iconic building will be the largest single office development to take place in Africa. The building will house 5000 Discovery employees. Value of the entire project is estimated to R1.8 Billion. Size 50 000m²

Status : Underway

Industry: Building

Region : Sandton

Sector : Private

Value : R 100 million+

Timing : January 2014 – October 2017. Occupation January 2018 (33 months).

Notes: Construction is ongoing, the facade is nearing completion and the contractor is currently busy with the internal work. Completion is still on track for October 2017.

If you are a valued Projects subscriber, you can find more details click here Discovery Health Head Office – Building – PPA: 13215.

If you are interested in becoming one of our subscribers, please visit our website.
To view notes with screenshots on how to use our website, please visit our Wiki site.
To view more articles, please visit our blog.

About Sasha Anderson

Millennial Mom + wife living the hash-tag life. Reach out if you want to talk: L2B, social media, construction, technology, marriage, parenting, popular culture and travel. Remember: If You Fail - Fail Forward

Did You Know #DYK – A Walk Through Your Advisory Setting

A Walk Through Your Advisory Setting

Welcome to the 1st edition of a new supplement we are adding to our weekly Blog called “Did You Know”.

We will use this insert to either teach you something new or refresh your memory on something old, but still interesting to know ;).

Today I’m going to give you the ins and outs and lowdowns of your Daily Advisories….. and right now I’m hoping you are not squinting your eyes and asking “What is a Daily Advisory?” lol! but just in case you are….. Lets start from the beginning 😉

Simply put, your Daily advisory is all the leads we send you on a daily bases, according to the filters YOU selected.

So, Did You Know – you can adjust your Daily Advisory whenever you like? well, you can and this is how!

 

Once logged in – Hover your cursor over your Name, this will bring up a drop down menu as illustrated in the below diagram.

Select Advisory Setting and let us begin:)

 

 

There are 7 Consecutive Steps you need to follow.

Step 1 – Email Set Up: 

This is the email you have indicated to us as the one you want to receive all Advisories on.  The Tick indicates that this email address has been verified, If you did not receive a verification email or if it got lost – you may click on the Action tab and resend the verification email to yourself.

Below that is a list of the advisories you are paying for – you may De-select any of these if you like (This will not alter your current monthly rate)

So why would you want to deselect an advisory? well for instance, if you are subscribed to Private Projects, we give you Daily Tenders for free, however you may decide you are not interested in receiving Government Tenders…. then you would just simply remove the tick next to Industry Advisory 🙂

 

Step 2 – Categories: 

This is where you decide exactly what leads you are wanting to receive.

First lets go though the Tender Categories – you may select as many or as few of these as you like.

*Please be advised that if you opted out of receiving an Industry Advisory in the previous step, you should not have anything selected here.

 

Project Categories: Often large developments have both a building and infrastructure element and because both of these elements may not interest you, we have given you the power to choose whether you would like to receive updates on both or just one.

Project Status: These are the various stages in which a Project moves through from Conceptual right up until Completion.

Once again, we don’t see why you should receive information that is irrelevant to what you do, so here you get to decide what stages of the Project you would like to receive.

* Please be advised that the last two options will not be available to you, unless you are a Private Projects Subscriber.

OK so lets move on.

Step 3 – Values:


If you have a CIDB Grading you can be quite specific here, however if you are, for example, a Consultant and don’t require a CIDB, you should still select all, as there will be instances where a tender is Turnkey and there may be a CIDB requirement for the contractor all on the same tender.

 

Just for interest sake I have listed below the industries that may apply for a CIDB grading 🙂

 

The Project Values refer to the size of the Development, here you may decide which size Projects would be of interest to you .

 

Step 4 – Industries

 

Now this is two fold, firstly if you have Tender Categories selected, here you get to be specific about the industries you service.

 

For instance: If your company was in the security sector and really only supplied and installed security solutions to the Hospitality & Leisure as well as the retail sector, then this is what your advisory would look like:

 

* Please note that without an industry selected, your selected Category will be deemed null and void.

 

OK so that covers the use of industries for your Government Tenders, now to explain them in Projects.

Now remember, you would have already selected whether you are interested in the Building or Infrastructure Projects in Step 2 – Categories

So now lets say you selected only Building, you can now use the industries selections to tell us in what industry you would like to receive Building Projects ….. are you still with me?

You would not select anything pertaining to Infrastructure, for example Roads or Water.

 

 

Step 5 – Regions:

Regions are subscription dependent, meaning the following:

Daily Tender SA – You may Select as many regions under the South Africa selection.

Daily Tender Africa – You may select any of the Non South African Regions.

Daily Tender SA +Africa – You may select from all the regions available.

Private Projects – You may select from all the regions.

 

Step 6 – Keywords

This is your fail safe step, this ensures you miss nothing!

 

 

 

First search for your keyword, then Select the keyword and by using the action tab, click on the add Keyword drop down.

And just like that you have added your first keyword.

You can select multiple words and add them to save time:) – You may select up to 80 Keywords.

 

And here we are at our final step…

Step 7 – Custom

These options are self explanatory, however I do want to clarify the following:

  1. By ticking this option, we will still send you an advisory even if there is a day whereby your filters don’t match anything we have updated or published for that day. If this option is ticked and you DON’T receive an advisory on a particular day – give us a call so we may see what the issue was.

5,6,7. You may select one of these in order to receive a breakdown of all your monitored Projects

8.  Automatic Monitoring saves you from having to go through Projects and having to monitor them yourself. By selecting this option, the system will automatically monitor all Projects published that match your filters.

 

Once you have gone through step 1 to 7 and are happy with your selections please make sure you click on the SAVE tab at the bottom of the page 🙂

And that is our walk through your Advisory Setting :).

Of course if you are still unable to do this yourself, you are always welcome to contact your Account Executive or call Head Office for assistance:).

 

I hope you found this helpful, if so, please look out for our next edition of DYK 🙂

If you are interested in becoming one of our subscribers, please visit our website.

To view notes with screenshots on how to use our website, please visit our Wiki site.

To view more articles, please visit our blog.

About Sherina Shawe

I am a strong believer in "What you put in , is what you will get out" and this drives me every day, whether it's at home with my gorgeous family or at work where I get to fuel my competitive spirit. I love who I am and who I'm becoming. I love where I am , but more importantly where I'm going.... #EternalOptimist #Aspire2Inspire

Featured Project : Radisson Blu Hotel and Residence (Triangle House)

Radisson Blu Hotel and Residence (Triangle House)

Radisson Blu Hotel and Residence (Triangle House)

Description : The former Safmarine Building, now known as Triangle House, on the corner of Riebeek and Long Streets, Cape Town, in the Western Cape, will be transformed into the 5 star Radisson Blu Hotel and Residence. All 166 flats will have dedicated parking bays. Currently used as offices, the building will be transformed into upmarket apartment units starting at 40m² and going up to 160m² for the penthouse apartments. GPS Coordinates: -33.9196757, 18.42239429999995.

Status : Underway

Industry: Building

Region : Cape Town

Sector : Private

Value : R 100 million+

Timing : January 2016 to April 2017. (15 months).

Notes: Construction is ongoing with completion estimated April 2017.

 

If you are interested in becoming one of our subscribers, please visit our website.

To view notes with screenshots on how to use our website, please visit our Wiki site.

To view more articles, please visit our blog.

About Sasha Anderson

Millennial Mom + wife living the hash-tag life. Reach out if you want to talk: L2B, social media, construction, technology, marriage, parenting, popular culture and travel. Remember: If You Fail - Fail Forward

The timing of Tenders – Award Dates

Award Dates

97-blog-award-dates

I work in the Private Projects Department at Leads 2 Business, following the progress of construction developments. Once a project reaches Tender stage, we endeavour to source the award information for the tender linked to that project. In my nearly 5-year experience in dealing with tenders, I have come to learn about a few of the procedures and regulations that need to be adhered to throughout the tendering process. I have no doubt that there is more to learn, but in this blog post I will talk about some of the processes and procedures that I have encountered in the public tendering process, through my understanding.

Public tenders seem to be awarded after a period of between 90 to 120 days from the closing date, however, this time frame could vary – The award can be made before or after this period, provided that the validity period has not expired.

Once the successful bidder is notified, the tender award is not simply finalised with the contract starting immediately thereafter. A public notice should be advertised to indicate the intention to award. There should also be an appeals period, rejection letters, an appointment letter, a contract, and certain construction regulations to adhere to.

Notice of Award / Intention to Award
Once evaluation and adjudication is finalised and a recommendation has been made, the bids should be opened and read out in public, for transparency purposes. A bid register should be published on the client’s website so that the tenderers are able to view the prices that were submitted by the other service providers, should they not have been able to attend the opening of the bids. Successful and unsuccessful tenderers should then be provided with written notice, and a notice of intention to award should be publicly advertised to allow for possible objections from the other bidders.

Appeals Period
Once the intention to award has been advertised, a certain period should be allowed for objections, if any, from other service providers. A tenderer can appeal the award, usually within 14 calendar days (this may differ) from the date of the letter of intent. Clear instructions for the appeals process should be included in the contract documents.

Letter of Appointment
Once the appeals process has concluded, the successful tenderer is issued with an appointment letter. This does not necessarily mean that the award has been finalised. There could be conditions stipulated in the appointment letter which need to be fulfilled before a binding agreement can come into effect.

Binding Contractual Relationship
The contractual relationship begins once the successful bid has been accepted in writing, followed by a written agreement which is signed by both parties. The award can be deemed finalised at this point.

Notification of Construction Work
Should the contract meet the requirements set out in the construction regulation for the Notification of Construction Work, the main contractor must notify the Department of Labour prior to the commencement of construction. A copy of this notice, among other important documents, must be kept in the Occupational Health & Safety File (OH&S File) on site.

Bear in mind that the processes above are not the only ones to consider before the award date is finalised. There are other processes that an award may have to go through, depending on the client’s requirements, the type of goods or services being procured, and even the value of the contract, among others.

The award is not the end of the process. It signals the beginning of the contract.

Sources:
Durban
Umdoni
Google
Gijima
Durban Gov
KZN Treasury
Polity

If you are interested in becoming one of our subscribers, please visit our website.
To view notes with screenshots on how to use our website, please visit our Wiki site.
To view more articles, please visit our blog.

About Bianca Warwick

I had the privilege of joining the Leads 2 Business content team in January 2012. I work in the exciting Projects department, following the progress of construction developments in KwaZulu-Natal and the Free State.

City of Johannesburg, future outlook, where are we going/growing?

City of Johannesburg, future outlook, where are we going/growing?

I always believe that in order to know where you are going you have to know where you are from, I personally think that applies to every aspect in our lives including where we live. So when I was asked to write about the future of our beloved City of Gold, the thought occurred to me that it would be pretty amazing to see where it all began, like a newborn on a journey through life.

Johannesburg was founded in 1886 as a result of the discovery of gold, which rapidly attracted people to the area and within 10 years the city Johannesburg included 100 000 people.  Like many 19th century mining towns, Johannesburg was a rough and disorganised place and major building developments only took place in the 1930s. By the late 1960’s and early 1970’s tower blocks such as Carlton Centre and the Southern Life Centre filled the skyline of the Central Business District. Sandton City was opened in 1973, followed by Rosebank Mall in 1976 and Eastgate in 1979. Johannesburg kept on evolving and is now home to some of Africa’s tallest structures such as Sentech Tower and Ponte City Apartments.

Johannesburg is often described as Africa’s economic powerhouse, and contentiously as a modern and prosperous African City. Johannesburg like many metropolises has more than one CBD including but not limited to Sandton CBD, Rosebank CBD and Roodepoort CBD, just to mention a few.

Just have a look at the amazing evolution of Johannesburg:

Johannesburg City Centre in 1896

Johannesburg City Centre in 1896

Modern Johannesburg

Modern JohannesburgCommissioner Street 1890

Commissioner Street 1890

Commissioner Street 2015

Commissioner Street 2015

The Rand Club 1888

The Rand Club 1888

The Rand Club 2015

The Rand Club 2015

With an ever evolving city, what does the future hold for Jozi?

  • The Kazerne Intermodel Transport Facility : Construction is underway on a world-class intermodal transport facility which will transform the commuter environment in Johannesburg’s CBD, creating a clean, safe, welcoming place for residents, commuters, tourists and investors in the heart of the inner city.

( PPA 16631 )

  • The Illovo Precinct : The precinct will have various components including office and commercial, hotel and conferencing, residential 1, residential 3 and retail.

( PPA 8548, PPA 8549, PPA 8550, PPA 8551, PPA 8553 )

  • NMT Milpark Precinct : Construction of the Milpark Precinct non-motorised transport implementation development in Milpark, Gauteng.

( PPA 18328 )

  • Riversands Commercial Park : Riversands offers a variety of commercial precincts – allowing for retail, office, warehousing and light industrial business premises. Riversands Commercial Park is set to become the preferred commercial development in Northern Johannesburg

( PPA 17864, PPA 17865, PPA 17866, PPA 17867 )

 

With a short insight into the future of Jozi, the place of Gold as we know it, is one of the top places to be, see and experience. Our very own “Big Apple” as you may say.  A World Class African City of the Future.

Johannesburg-Sunset

 

https://en.wikipedia.org/

http://businesstech.co.za/

 

About Nadine Vermeulen

I started working at Leads 2 Business in October 2014 in the Leads 2 Quotes Department. I managed all the Daily Tender Bill Requests and followed up on BoQ's for our Daily Tender Subscribers. In 2017, I was promoted to L2Q Assistant and now work with Bill of Quantities for Contractors. 🙂

The Big Five

 

the big five NAMES

 

Johannesburg, the concrete capital of South Africa houses the head offices of the “Big Five” construction companies. It’s a jungle out there…..

The Lion –

Murray & Roberts is a leading engineering and construction services group of companies. It has predominantly delivered infrastructure projects throughout South and Southern Africa for more than 110 years, and is today recognised as an international engineering and construction group. Murray & Roberts is a group of world-class companies and brands aligned to the same purpose and vision, and guided by the same set of values. The Group offers engineering, procurement, construction, commissioning, operations and maintenance services in the oil & gas, underground mining, power and water as well as the civil infrastructure and building markets. Murray & Roberts is headquartered in Johannesburg, South Africa, and is listed on the JSE Limited. It has offices in South Africa, Namibia, Botswana, Mozambique, Zambia and Ghana, the United Arab Emirates, Australia and South Korea, Scotland, Canada, the USA and Chile. Their values are: Integrity – Respect – Care – Accountability – Commitment. The purpose of the company – Delivery of infrastructure in a sustainable way to facilitate economic and social development. By 2020 they aim to be a leading diversified project engineering, procurement and construction group in selected natural resources sectors and supporting infrastructure.

The Rhino –

Aveng Grinaker-LTA is a multi-disciplinary construction and engineering group that delivers landmark projects. The company combines African roots – and a proud South African heritage going back 117 years – with an unwavering commitment to world-class safety and quality. Their expertise in building, civil engineering, roads, earthworks, concrete, ground engineering, mechanical and electrical is delivered through focused business units acting in synergy. Every aspect of Aveng Grinaker-LTA’s business is shaped by their core values of: Safety, Accountability, Integrity, Client satisfaction and employee fulfillment. Aveng Mining is one of only four deep-level shaft sinking companies worldwide and is involved in all aspects across the mining value chain, ranging from shaft sinking, underground development and contract mining, opencast mining, mineral processing and acid mine drainage plants, to construction of mining related infrastructure and the supply if mining equipment and products. Aveng Manufacturing manufactures and supplies construction products to the construction sector, services and engineered solutions to mining, water, oil and gas and construction clients, and rail construction and maintenance services to the transport sector. Aveng Steel supplies a wide product range to the steel construction and automotive industries in domestic markets, from its extensive steel yards, modern and comprehensive processing centres and manufacturing plants.

The Leopard –

Stefanutti Stocks is one of South Africa’s leading multidisciplinary construction groups with over 12 000 employees and the capacity to deliver a range of infrastructure development projects to its clients across diverse sectors. All South African operations are divisions of Stefanutti Stocks (Pty) Ltd, a Level Three B-BBEE contributor. This large South African construction company has a Grade 9 rating from the South African Construction Industry Development Board (CIDB), providing it with unlimited tender capability. Furthermore, its broad spectrum of expertise means that it has the capability and capacity to offer a single point responsibility on multidisciplinary (infrastructure development) projects, effectively removing the interface risk from the clients’ domain. Vision: A dynamic group delivering complete construction and contracting solutions. Mission: Maximise stakeholder value by building a sustainable business presence in Africa and targeted international markets. This will be achieved by being the preferred construction partner for all their stakeholders; Professional conduct which will establish a track record of industry excellence; Being a desirable place of work, a natural home for creativity, enthusiasm and personal safety. They are active in South Africa and across sub-Saharan Africa including in Benin, Botswana, Mozambique, Namibia, Nigeria, Sierra Leone, Swaziland, Tanzania and Zambia. In the United Arab Emirates (UAE) they have established businesses in Dubai, Abu-Dhabi and Qatar.

The Buffalo –

The origins of the present group date back to 1970 when Wilson-Holmes [Pty] Ltd was formed by John Wilson and Brian Holmes.A number of mergers followed resulting in the name being changed to Wilson Bayly Holmes (Pty) Limited in 1983 and finally to WBHO Construction in 1994.Today the group is one of the largest construction companies in Southern Africa and is listed on the Johannesburg Securities Exchange. The driving force behind WBHO is a core of dedicated, hands-on management professionals whose experience spans decades of major construction projects in southern Africa, the Middle East and various Indian Ocean islands. The fact that the management and staff have a significant shareholding in the company means that you can be assured of 100% commitment. WBHO’s offices are strategically located in Sandton, Cape Town, Durban, Port Elizabeth and East London. Construction activities, which cover the full spectrum, are divided into three main operating divisions, Building Construction, Civil Engineering and Roads and Earthworks. Their Australian subsidiary, Probuild Constructions, has its headquarters in Melbourne.

The Elephant –

Group Five was established in 1974. Today, the group is an integrated construction services, material and infrastructure investments group operating in over 25 countries with over 10 000 people in its employ. Group Five has a Construction Industry Development Board (CIDB) Level 9 rating. The group has a Level 2 Construction Charter Broad Based Black Employment Equity (BBBEE) rating. Key Contracts: Mining, Industrial, Power, Oil and Gas, Water and Environment, Real Estate and Transport. The group has structured its operations across three business clusters. When combined, these deliver multiple profit streams from a single contract namely Investments and Concessions, Manufacturing and Engineering and Construction. The new Group Five Head Office, was awarded a “5-Star Green Star SA – Office Design v1” rating by the Green Building Council of South Africa (GBCSA) in 2014. The building was one of only seven buildings in Gauteng to receive this prestigious rating. It was also the first building in Waterfall City to receive a Green Star SA rating. This leading green building was designed by LYT Architects and benefited from the sustainable design expertise of WSP Africa. The building was completed in January 2014 and was valued at R500 million on completion. Bulk earthworks for this 25 500sqm headquarters began in July 2012.

Sources
S1
G5
WHBO
Murrob
Grinaker
Stefanutti Stocks

About Debbie Wessels

I started at Leads 2 Business in April 2008 in the tenders Department and transferred to the Projects Department during the same year. I was appointed Head of Department for Projects from February 2011 to March 2022. April 2022 I started a new adventure as Content Regulator.

At which point in the Project Life Cycle can your business find Value?

At which point in the Project Life Cycle can your business find Value?

84-Blog-Project-Lifecycle-Business-Value

 

At which point in the Project Life Cycle can your business find Value?

 

To answer the above lets break it down.

 

  1. What is the Project Life Cycle?

One of the services we offer at Leads 2 Business is Projects and the various phases within these Projects are known as the Project Life Cycle. The Stages in a Project Life Cycle are Conceptual, Procedural, Design, Tender, Awarded & Underway, Complete and Postponed.

To learn more about each Life Cycle you can check out How Projects Work

 

  1. What is Value?

According to the Business Dictionary value is described as, “The extent to which a good or service is perceived by its customer to meet his or her needs or wants, measured by customer’s willingness to pay for it. It commonly depends more on the customer’s perception of the worth of the product than on its intrinsic value.”

 

In short the answer to the question, “At which point in the Project life cycle can your business find value?” is simple: you can find value in every point in the Project Life, depending on what your business does.

 

You may be asking, “How?”

 

Here are a few examples:

Professionals like Architects, Engineers and Quantity Surveyors can contact the Client/Developer directly at the Conceptual/Procedural stage to be appointed as part of the Professional team.

Project Managers can contact the Client/Developer directly at Conceptual/Procedural/Design Stage to get involved. They can also contact other Professionals appointed on a Project to market and build relationships.

Subcontractors like plumbers, electricians and painters can contact Companies at Tender/Awarded Stage to provide quotes.

Vendors, Suppliers, Manufacturers and Fabricators can contact the Architect/QS during Design Stage if they have a product that can be specified on the BoQ and supplied later.

Property Managers can contact the Client at Conceptual Stage and start building a relationship while the project is still being developed in order to be appointed once Complete. They can also contact the anchor tenant at Completed Stage to get involved.

IT, Security and Cleaning Services can get involved at Tender/Awarded Stage to provide quotes and offer subcontracting services to Contractors that may be awarded the Project.

Landscapers can contact the Landscape Architect or Architect during Design Stage or contact the Client directly at Underway Stage to offer their services. They can also look at completed projects and offer services in the future as a marketing tool.

All of the above can benefit from the Postponed Stage so they are aware when the Project is going ahead in order to manage their work flow efficiently.

Finding Value in the Project Life Cycle couldn’t be easier with Leads 2 Business.

Want to know more about Projects or any of the other Services we offer? Contact me on SashaA@L2B.co.za

If you are interested in becoming one of our subscribers, please visit our website.
To view notes with screenshots on how to use our website, please visit our Wiki site.
To view more articles, please visit our blog.

About Sasha Anderson

Millennial Mom + wife living the hash-tag life. Reach out if you want to talk: L2B, social media, construction, technology, marriage, parenting, popular culture and travel. Remember: If You Fail - Fail Forward

1 15 16 17 18 19